Let there be power

Finally a great day arrives at the Hopethiopia project site as power arrives with the transformer being hooked up to the new grid

The transormenr is hooked up to the main grid and the power tested at being positive to the north site.

Blog, Current News, Mission Trips

Leave a Reply